ABOUT US      MISSION STATEMENT      ENGINEERING. SERVICE      OIL AND GAS SERVICE         CONTACT US

 

EMPLOYMENT DIVISION
EMPLOYER PAGE
EXPORT DIVISION
TRADE DIVISION

MACHINERY DIVISION
CANDIDATE PAGE
PRODUCTS
EXHIBITIONS
GLOBAL TRENDS      
ECONOMIC REVIVAL  
RESEARCH & DEVELOPMENT
QUALITY & PRODUCTIVITY  
ENTREPRENEURSHIP
DEVELOPMENT DIVISION

HIGH TECH DIVISION          
DEVELOPMENT SYSTEMS
(NEW)
students Project

Environmental.QualitySyarem
Kalabagh
Central Asian project
Poverty Alleviation   
Earthquake

E-Learning
Glocalization
Environment Development
Business Environment
Water Resource Management
Urban Development
Trade and Development
Disaster Management

 

 

 

 


 

 

PRODUCTS

                           

    The projected capacity of the chemical waster water treatment plant is 1825 tons/hour and mainly undertakes the treatment of industrial waste water and part of sanitary waste water from the First, the Second and the Third Petrochemical Plant, Polyester Plant, Instrument and Meter Plant and from other plants of PFAET.

 

 

  

The projected capacity of the Oil Refinery Waste Water Treatment Plant is 1825 tons/hour and mainly serves for the Refinery Plant and Rubber Plant of PFAET. The types of waste water include oily waste water, sulfur-bearing waste water, alkaliferous waste water, recycled water blow down, sanitary waste water and rubber waste water.

 

 

 

  The processing capacity of the Sanitary Waste Water Treatment Plant is 20,000 cubic meters/day and the total investment is RMB10 million. It was set up in 1994. The plant adopted the technology of two-phase method of mineral slag packing and method of biogenic contact oxidation and processes the city’s sanitary waste water. The outflow water quality is 60mg/liter, 20mg/liter

 

 

 

 

 

© COPYRIGHT 2001-2006 ALL RIGHTS RESERVED